Finishing is what people see of your home, and what you live with every day. Because finishing work is extensive and overlapping, the right order saves time and avoids rework, such as breaking walls after painting to run a forgotten cable. In this article we set out the stages of finishing villas and apartments from shell to handover, as we carry them out in our projects in the Eastern Province.

1. Receiving and inspecting the shell

Before starting, the building is inspected: straight walls, floor levels, the condition of the slabs, and any cracks or damp. Finishing does not fix structural defects; it only hides them for a while.

2. Electrical and plumbing installations

Electrical and plumbing installations inside the walls are completed according to the furniture and appliance layout: sockets, switches and lighting points, water outlets in kitchens and bathrooms, and air-conditioning points. The water network is then tested for leaks before the walls are closed. Power Maas does this work with a dedicated department as part of its service Electrical and Plumbing.

3. Insulation

Bathrooms, kitchens and roofs are waterproofed before tiling, because a leak under tiles is one of the most expensive defects to repair. See our service Waterproofing and thermal insulation.

4. Plastering

Walls and ceilings are covered with plaster so they are level and ready for paint. The quality of plastering shows later in straight corners and smooth paint, so guides and metal corner beads are used, and the plaster is kept moist on hot days.

5. Ceilings and gypsum

Suspended ceilings and gypsum work are done after the installations, leaving openings for lighting and air conditioning in the right places.

6. Flooring and ceramics

Ceramic or porcelain floors are laid, along with wall tiling in kitchens and bathrooms, with the right falls towards the drains. Expansion joints are left, especially in areas exposed to heat.

7. Painting

Painting starts with filler and primer coats, then the finishing coats. External facades need paints made to withstand sun and humidity, which matters in the Eastern Province where humidity is high near the coast.

8. Facades and external works

Facades include stone cladding or external paint, followed by external works: the courtyard, the boundary wall and interlock paving. Power Maas carries out external works as part of its service Outdoor Site Works.

9. Final fittings and handover

In the final stage, sockets, switches and light fittings, sanitary ware and mixers, and doors are installed. Each room is then inspected before handover, and any snags are recorded and fixed.

Examples of our finishing projects

Tips before you start finishing

  • Decide where furniture and appliances go before the installations, not after.
  • Choose materials and their grades before starting, and write them into the contract.
  • Do not skip waterproofing in bathrooms and kitchens.
  • Ask for a schedule that shows the order of the work.

Frequently Asked Questions

Do you finish apartments too?

Yes. We finish villas, residential apartments and duplexes.

Can you finish a building that another contractor built?

Yes. We receive and inspect the shell first, then start finishing once any issues are fixed.